Skip to main content

Linen for Hajj and Umrah hotels: what to choose and how much to stock

Hajj and Umrah hotels in Makkah and Madinah have high occupancy, short stays and concentrated peak seasons, so linen turns over much faster than in a typical city hotel. Choose for durability and easy handling first, hand feel second.

Short answer

  • Many rooms sleep three or four, so count linen by bed, not by room.
  • Peak days bring mass check-outs, so use the high end of the par level: 4–5 sets per bed, plus 10%–20% spare.
  • Prefer white, standard sizes and fabrics that survive industrial washing, so laundry and re-ordering stay simple.
  • Work backwards from the season and leave room for sample approval, production and sea freight.

01Why linen wears out faster

  • High occupancy: rooms are full almost every day in season, so linen gets little rest.
  • Short stays: guests leave after a few nights, so linen is changed more often.
  • Many multi-bed rooms: triples and quads are common, doubling the linen per room compared with a double.
  • Group check-outs: whole groups leave on the same day, putting peak pressure on the laundry and spare stock.

02Count by bed

Linen quantity = number of beds × pieces in use per bed × par level + spare.

ItemExample
Rooms200 quad rooms
Beds200 × 4 = 800
Sheets in use per bed1
Par level4 sets
Sheets needed800 × 1 × 4 = 3,200
Plus 10% spareAbout 3,520

Work out duvet covers, pillowcases and towels the same way. For how many sets each bed needs, see "How Many Sets of Bedding Does a Hotel Need?".

03Choosing fabric and specs

  • Colour: white first. It can be bleached and washed together, and re-orders will not show colour differences.
  • Size: with mostly single beds, keep to one or two sizes to cut sorting and mismatches.
  • Fabric: cotton feels better; for more durability, faster drying and lower cost, consider a cotton-polyester blend.
  • Towels: no need for very high GSM. A mid weight dries faster and costs less to wash, which suits high turnover.

04Leave enough time before the season

Count back from the start of the season: first allow for sea freight and customs, then production, and before that sample approval. With a new supplier or a custom logo, sample approval usually takes the longest.

  • Standard specs: start at least 3–4 months ahead.
  • Custom logos or several categories: start 4–6 months ahead.

05What to put in your inquiry

  • Room types and beds: how many doubles, triples and quads.
  • Size, colour and fabric for each item.
  • Par level, or how linen is washed: in-house laundry or an outside laundry.
  • Whether to add a logo, and packaging and label-language requirements.
  • Required arrival date and port.

If you have a product list, you can start now. Excel, Word and PDF all work.